ISO 9001:2008 Certified Company
TAM Completion Systems
FREECAP Tool Applications
FORM #SF-17 REVISION H

Form must be completed before
technical proposal or quotation can be provided.

* Indicates required field


Company Well
Address Location
Contact Name* Phone*
Date Fax
Email*

Quotation required via
Quotation by
Time
Date
Equipment required by Date
TAM Salesperson
Third Party Inspection Required
Yes No

Objective

Wellbore Configuration (One IPAD per packer size)

Casing

Open Hole Section FREECAP Mandrel
in mm

Casing OD

ID as Drilled
OD
Casing Wt
ID as Calipered
Weight
Casing ID
Deviation
Grade
Minimum Restriction
Max. DLS
Thread
Depth Set
MD/TVD
Centralizer OD
*Must be in US measurement
FT M
Mud Type
Packer to be set in
I.D.
Cased Hole
Open Hole
Setting Depth
Maximum differential pressure across packer
Static BHT
BHP
Bar PSI KPa
DEG C DEG
Bar PSI KPa
Time to Run In Hole
Desired time to set to reach differential press ra
Desired Tool Type:
FREECAP I (Wrap on Casing) (indicate number of tools next to seal length)
Standard Seal Length
3 ft. 5 ft. 10 ft. 15 ft. 20 ft. other
FREECAP II (Slide on Sleeve) (indicate number of tools next to seal length)
Standard Seal Length
1 ft. 3 ft.
Produced Wellbore Fluid Fluid to Swell Packer Additional Information
Oil-Gravity (sg) Type
%H2S %CO2
Water-Salinity (%)
Gravity (sg)
Submit Sample of Swelling Fluid
YES NO
Gas-Gravity (sg)
Salinity %
PVT Data Available
YES NO

In addition to the above data, please provide:
1.proposed wellbore sketch 2.mud report 3.open hole caliper


4620 Southerland, Houston, Texas 77092 • PH: (713) 462-7617 or (800) 462-7617 FAX: (713) 462-1536

Email: info@tamintl.com

© TAM International, Inc. 2012