Perforation Squeeze
contact_icon.gif  Contact Us    
ipad_icon.gif  Request for Application Analysis  

Perforation Squeeze

Requirement:

  • Lower perforations producing excess water
  • Suspected poor cement between zones
  • Isolation required.


Solution:
  • Run inflatable packer on coiled tubing or work string and set between upper and lower perforations
  • Squeeze cement into lower perforations. (Water shut-off chemicals can be used as option to cement)
  • Retrieve packer and work string
  • Place well back on production
 

 case_study.gif

Gulf of Mexico:

Challenge:
  • A 10,100’ gas well completion in the Gulf of Mexico was determined by PLT analysis to be producing water from the lower perforated interval.

Solution:
  • A 2-5/8” OD inflatable packer was run on 1-3/4”OD coiled tubing and set between the two sets of perforations in the 5 1/2” liner.
  • A low water loss cement slurry was pumped down and squeezed into the lower perforations.

Value Added:
  • The well was placed back on production with gas production increased by more than 7 MMCFD.

 

 
 