Water Shut Off – Horizontal Toe

Requirement:

  • Permanently plug the toe of a horizontal well producing excess water


Solution:
  • Run an Inflatable Bridge Plug (IBP) to above the water source segment of the well and inflate with cement for a permanent plug
 

 case_study.gif

Oman:

Challenge:
  • A single lateral horizontal well in a carbonate reservoir in Oman was selectively tested and determined to be producing water from the lower 600’ (toe) of the well.

Solution:
  • A 5-9/16” OD IBP was run and positioned 800’ from the end of 6-¼” lateral.
  • A wiper plug was pumped in front of a cement slurry designed for inflation of the packer.
  • Wiper plug was landed below the packer, pressure increased and packer was inflated with cement to insure a permanent solution.
  • Additional pressure was applied to hydraulically release from the IBP and dump remaining cement above the packer.

Value Added:
  • Well was placed back on production with reduced water production.
    Note: Optional procedures can also include use of an inflatable cement retainer to allow squeezing cement below the tool.

 

 
 