ISO 9001:2008 Certified Company
TAM Completion Systems
Home > Oil & Gas Applications > Cementing > Squeeze Cement - Open Hole > Multi-Lateral P&A
Multi-Lateral P&A
contact_icon.gif  Contact Us    
ipad_icon.gif  Request for Application Analysis  

Multi-Lateral P&A

Requirement:

  • Complete plug and abandonment of a multi lateral well to prevent future down hole cross flow between wells


Solution:
  • Run an Inflatable Bridge Plug (IBP) and set in each leg
  • Run an inflatable cement retainer and set above the IBP
  • Squeeze cement interval between cement retainer and IBP
 

 case_study.gif

Qatar:

Challenge:
  • Each leg of a 6-¼” open hole completed multi lateral well in Qatar required permanent plugging to assure elimination of cross flow within the reservoir.

Solution:
  • A 5-9/16” OD IBP was run and set in leg #1 followed by an inflatable cement retainer set 700’ above the IBP.
  • Thixotropic cement slurry was bullheaded into the interval between the packers, a wiper plug landed to remove hydrostatic from above and the work
    string released from the cement retainer.

Value Added:
  • The operation was repeated for leg #2 resulting in an effective plugging and elimination of potential cross flow between fracture swarms.

 

 
 
© TAM International, Inc. 2012