Drilling & Completions
Drilling Operations
- Two-Stage Cementing
CAP and Port Collar; North Sea
- Placing A Casing Annulus Packer Above Gas Sources
CAP; Gulf of Mexico
- Reduced Cement Stress Cracking
FREECAP Swellable Packer; South Texas
- Cement Integrity Using The MTM Hatch Packer
MTM HATCH Packer; Indonesia
- Cementing (CAP And Stage Tool)
CAP; Kuwait
- Multi-Stage Selective Cementing
CAP and Port Collar; China
- Metal-To-Metal Seal Port Collar
Port Collar; Alaska
- Mechanical Integrity Testing Using A Bridge Plug Application
SlikPak; Europe
- Through-Tubing Sidetrack – Bridge Plug
Inflatable Bridge Plug; Vietnam
- Bridge Plug Application
Storm Plug; Gulf of Mexico
- Non Top Drive Casing Circulator
Casing Circulator; Forth Worth, Texas
- Top Drive Casing Circulator
Casing Circulator; Central Texas
- Well Control - Plug Parted Drill Pipe
SlikPak™ Plus – Slickline/E-line Inflatable Packer; Papua New Guinea
- Secondary Barrier Assists Operator In Meeting New Drilling Requirements
FREECAP® – Swellable Packers; Gulf of Mexico
- Single-Set Inflatable Packer Set Above Failed Casing Shoe
Single-Set Inflatable Packer; Gulf of Mexico
- Operator In The GoM Requires Redundant Isolation For A Liner Top
FREECAP® – Swellable Packers; Gulf of Mexico
- Lost Circulation Zone in Permian Basin
LONGCAP - Casing Annulus Packer; Permian Basin
- TAMPlug Permanent Bridge Plug System
TAMPlug Permanent Bridge Plug System; South Texas
- Isolating a Gas Zone Below an Open Hole Cement Plug
TAMPlug Permanent Bridge Plug System; Culberson County, Texas
- Isolate Above the Lost Circulation Zone to get Cement to Surface
LONGCAP - Casing Annulus Packer; Permian Basin
- High-Temperature Downhole Environment in South Texas Experiences Losses
TAMPlug Permanent Bridge Plug System; Eagle Ford
- TAMPlug Permanent Bridge Plug System
TAMPlug Permanent Bridge Plug System; Deepwater Mexico
- Deepwater Leak-Off Test
Premium Multi-Set TAM-J Inflatable Packer; Deepwater Gulf of Mexico
- Leak Hunt in 22 in. Casing
700 TAM-J with 15.10 in. Dual-Anchor Element; Deepwater Gulf of Mexico
- Isolate Leak in 20-in. Production Casing by Performing Multiple Casing Tests
Multi-Set TAM-J; Deepwater Gulf of Mexico
- Set a Bridge Plug in 12¼-in Open Hole to Run and Cement 20-in. Casing
425 Single Set with 11-in. VE Element; Onshore Mexico
- Two-Stage Cementing of Intermediate Casing
Port Collar, LONGCAP, and Combo Tool; New Mexico
- Barrier Required for Blow Out Preventer (BOP) Testing during Drilling Operations
Single Set Packer with SE1 Element; Deepwater Gulf of Mexico
- Provide Annular Isolation and Perform Off-Bottom Cementing Operations
Pump Out SCC and TAMCAP Assembly; Queensland, Australia
- Open Hole Packer for Kick-Off Cement Plug During a Deepwater Sidetrack
TAM Abandonment Plug; Deepwater Gulf of Mexico
Zonal Isolation
- Two-Stage Cementing
CAP and Port Collar; North Sea
- Cement Integrity Using The MTM Hatch Packer
MTM HATCH Packer; Indonesia
- Metal-To-Metal Seal Port Collar
Port Collar; Alaska
- Zonal Isolation In CSG Well Using Three-Stage Cementing System
Three Stage Cementing System; Queensland, Australia
- Casing Annulus Packer Provides Shallow Gas Isolation
CAP; Gulf of Mexico, Indonesia, Australia
- Cementless Completion
CAP – Inflatable Casing Annulus Packer; Onshore U.K.
- Intelligent Well
CAP; Japan
- Selective Completion
CAP - Port Collar; Qatar
- Fracturing
PosiFrac Straddle System; Manitoba (Onshore)
- Liner Top Backup
FREECAP® Drilling and Completions Swellable Packers; Gulf of Mexico
- Secondary Barrier Assists Operator In Meeting New Drilling Requirements
FREECAP® – Swellable Packers; Gulf of Mexico
- Cementless Completion in Bakken
FREECAP® Swellable Packer; Bakken Shale
- Isolate Gas Zone While Performing Workover
SlikPak Retrievable Plug System; Tartagal, Argentina
- Base of Cement Plug Required for Storm Season
Inflatable Bridge Plug; Deepwater Gulf of Mexico
Liners
- Liner Top Backup
FREECAP® Drilling and Completions Swellable Packers; Gulf of Mexico
- Cementless Completion
CAP – Inflatable Casing Annulus Packer; Onshore U.K.
- Horizontal Radius Cementing
CAP and Port Collar; Nigeria
Gas/Water Isolation
- Cementing (CAP and Stage Tool)
CAP; Kuwait
- Barefoot Completion
CAP and Stage Tool; New Mexico
- Multi-Stage Selective Cementing
CAP and Port Collar; China
- Cementless Completion
CAP – Inflatable Casing Annulus Packer; Onshore U.K.
- Selective Completion
CAP and Port Collar; Qatar
- Gas Migration
CAP – Inflatable Casing Annulus Packer; Onshore Australia
- Gas Migration
LONGCAP Casing Annulus Packer with Deadbolt™; Gulf of Thailand
- Cement Integrity Using The MTM Hatch Packer
MTM HATCH Packer; Indonesia
- Metal-To-Metal Seal Port Collar
Port Collar; Alaska
Unconventional Resources
Tight Formations and Fracturing
- Fracturing
PosiFrac Straddle System; Manitoba (Onshore)
- Multiple Open Hole Fracture Operation In Dual Lateral Well
PosiFrac Straddle System; Southeastern Saskatchewan
- New Posifrac Straddle System For Open Hole Frac Treatment
Multi-Set Straddle Packers; Canada
- Open Hole Hydraulic Fracturing
Multi-Set Inflatable Packer; Alabama
- Isolation Plug
Single Set – Retrievable Inflatable Packer; Onshore Australia
- Selective Completion
CAP and Port Collar; Qatar
- Straddle Test & Treat
PosiFrac® Straddle System; Trinidad
- Selective Test Or Treat - Swabbing
PosiFrac® Straddle System; East Texas
- Open Hole Acid Stimulation In An Unconventional Heavy Oil Well
PosiFrac™; Russia
- First PosiFrac Multi-Stage Completions in the Eagle Ford Shale
PosiFrac® Multi-Stage Fracturing System; Eagle Ford Shale
- 39 Zone Multi-Set Straddle Stimulation
PosiFrac® Straddle System; Kansas
- Single Trip Multi-zonal Acid Stimulation/Refrac Solution - Kurdistan
Full-bore Inflatable Packers; Northern Iraq - Kurdistan
- Cemented Completions
PosiFrac Toe Sleeve™ (PTS); Utica Shale Formation
Heavy Oil
- Isolates Damaged Zone In Heavy Oil SAGD Well
FREECAP® GT – Swellable Packers; Alberta, Canada
- Scab Liner Isolates Steam Breakthrough In Heavy Oil SAGD Completion
FREECAP® Unconventional Resources: Heavy Oil GT – Swellable Packers; Canada
- Steam Injection Oil Recovery Enhancement Solution Utilizes High-Temperature Swellable Packer Technology for Production Improvement in Heavy Oil Application
FREECAP GT™–Geothermal Swellable Packers; Middle East
- Run Smart GFR FREECAP I with two Instrumentation Lines (1/2 in. and 7/16 in.) for Isolation and Observation
Smart GFR FREECAP; Alberta, Canada
Gas Storage
- Isolation Plug
Single Set – Retrievable Inflatable Packer; Onshore Australia
- Cavern Repair
Inflatable Bridge Plug; South Texas
- Mechanical Integrity Testing Using A Bridge Plug Application
SlikPak™; Europe
Coal Bed Methane
- Injectivity Test
PW Tool – Multi-Set Straddle Packer; Onshore U.K.
- Zonal Isolation In Coal Seam Gas Well Using Three-Stage Cementing System
Three Stage Cementing System; Queensland, Australia
- Open Hole Acid Stimulation In An Unconventional Heavy Oil Well
PosiFrac™; Russia
- Open Hole Hydraulic Fracturing
Multi-Set Inflatable Packer; Alabama
Well Intervention
Gas/Water Shut-Off
- Excess Water Production
Inflatable Packer; Gulf of Mexico
- Casing Shoe Failure
Single-Set Inflatable Packer; Gulf of Mexico
- Casing Failure
Inflatable Scab Liner; China
- Heel Producing Excessive Water
TAM-J Inflatable Packer; Canada
- Middle Perforations Producing Water
Inflatable Scab Liner; Cabinda, Angola
- Multiple Zone Water Shutoff Allows Operator To Maximize Production
FREECAP® – Swellable Packers; United States
- Open Hole, Vertical Completion Producing Excess Water
Inflatable Bridge Plug; West Texas
- Multilateral Horizontal Well Making Excessive Water From One Lateral
Inflatable Bridge Plug; Canada
- Water Shut Off, Horizontal Multilateral
Inflatable Bridge Plug; Canada
- Horizontal Well Producing Excess Water
Inflatable Bridge Plug; Sultanate of Oman
- OH Squeeze for Significant Loses
425 x 788 TIP & Cement Retainer Kit; Gulf of Mexico
Workovers
- Corroded Tubing Requiring P&A
TAM-J Multiple-Set Inflatable Packer; Gulf of Mexico
- Casing Failure
Inflatable Scab Liner; China
- Bridge Plug Application: Casing Repair
Inflatable Bridge Plug; South Texas
- Heel Producing Excessive Water
TAM-J Inflatable Packer; Canada
- Cemented Tieback
EPIC™ Solutions – TAMCAP and MTM Port Collar; Offshore – North Sea
- Straddle Test & Treat
PosiFrac® Straddle System; Trinidad
- Multiple Zone Water Shutoff Allows Operator To Maximize Production
FREECAP® – Swellable Packers; United States
- Horizontal Well Producing Excess Water
Inflatable Bridge Plug; Sultanate of Oman
- Shut Off Water Producing Faults
Single Set – Retrievable Inflatable Packer; Offshore Qatar
- SlikPak™ Plus To Run Inflatable Bridge Plugs
SlikPak™ Plus; Baku, Azerbaijan
- Shut Off Water-Producing Perforations
SlikPak™ Plus – Slickline/E-line Inflatable Packer; Northern Iraq
- SlikPak™ Plus To Run Inflatable Bridge Plugs On A Satellite Platform
SlikPak™ Plus; Denmark
- Screen Section Damaged
Inflatable Scab Liner; Cabinda, Angola
- BOP Replacement
Single Set – Retrievable Inflatable Packer; Onshore Kuwait
- Secondary Barrier For BOP Maintenance
7 ½ inch Single Set – Inflatable Packer; Eastern Canada
- Wellhead Replacement
SlikPak™ Plus – Slickline/E-line Inflatable Packer; Onshore Saudi Arabia
- SlikPak™ Plus Secondary Barrier To Add BOP Stack in Gulf of Mexico
SlikPak™ Plus– Slickline/E-line Inflatable Packer; Gulf of Mexico
- Production Annulus Isolation Barrier to back up the Production Packer
Single Set Packer and Cement Retainer Kit; Bass Strait, Victoria, Australia
- Leak Hunt in 5-1/2-in. Casing
TAM-J Inflatable Packer; Offshore Newfoundland, Canada
P&A/Decommission
- Multilateral Temporary Abandonment
Inflatable Bridge Plug; Canada
- Corroded Tubing Requiring P&A
TAM-J Multiple-Set Inflatable Packer; Gulf of Mexico
- Plug & Abandonment
HR Tool – Hydraulic Release Mechanism; Onshore U.K.
- Plug & Abandonment
Single Set with TE2 Inflatable Cement Retainer; Deepwater Gulf of Mexico
- Abandonment Plugs
Single Set – Retrievable Inflatable Packer; Offshore Azerbaijan
- Plug And Abandon Casing Section Milled
Inflatable Bridge Plug; Norway
- Sub Sea Leaking P&A
Inflatable Packer; Gulf of Mexico
- Remote Access/Rigless Operations Using SlikPak
SlikPak™ Plus - Inflatable Packer System; - Fort Nelson, British Columbia, Canada
- High-Expansion Inflatable Element Used in Deepwater P&A
Single Set Inflatable Packer; Gulf of Mexico
- Temporary Well Suspension in Remote Gas Field
Single Set Inflatable Packer; Northeast British Columbia, Canada
- Well Abandonment for Sidetrack
TAMCAP Casing Annulus Packer; Newfoundland, Canada
- Plug & Abandonment
Single Set Inflatable Packer; Deepwater Gulf of Mexico
- P&A / Decommission: Gas Migration Shut-off
TAM Inflatable Packer (TIP) and Hydraulic Release; Offshore Nigeria
- Rigless Temporary Well Barrier for Wellhead Replacement prior to P&A
SlikPak Retrievable Bridge Plug; Louisiana
- Permanent Inflatable Bridge Plug Set Inside 32-in. Conductor
TAMCAP Bridge Plug; - Qatar, Middle East
- To Permanently Abandon the Well
TAM Retrievable Inflatable Packer (TIP); - Offshore Holland
- Permanent Inflatable Bridge Plug Set Inside 32-in. Conductor
TAMCAP Bridge Plug; - Qatar, Middle East
Well Integrity Testing
- Water Injection Well - Integrity Testing
SlikPak™ Plus – Slickline/E-line Inflatable Packer; Offshore Qatar
- Gas Cavern Well Integrity
Single Set – Retrievable Inflatable Packer; Onshore France
- Well Integrity Testing
SlikPak™ Plus – Slickline/E-line Inflatable Packer; Onshore France
- Well Integrity Testing 2
TAM Inflatable Packer - Resettable (TIPR) with SE1 Element; Northern Alberta, Canada
- Inflow Test
TAM-J Multi-set Inflatable Packer; Offshore Baku, Azerbaijan
Reservoir Optimization
Production Testing
- Selective Testing Using SlikPak
SlikPak™ Plus; North Sea
- Temporary Plug Testing
SlikPak™ Plus; Cabinda
- Well Testing – Down Hole Shut In
SlikPak™ Plus; Mexico
- Production Testing
TAM-J – Multiple Set Inflatable Packer; Offshore Qatar
- Multi-Lateral Isolation
TAM-J Multiple Set Straddle Assembly; Canada
- Selective Testing - Stress Management
TAM-J Multiple Set Straddle Assembly; California
- Multiple Set Testing Capability Allows Operator To Reinitiate Injection
TAM-J Multi Set Packer System; Canada
- Mini-Frac Analysis To Optimize Hydraulic Frac Operation
PosiFrac® Straddle System; Permian Basin
- Test for a Pressure Leak with Injection Testing - Tanzania
PosiFrac® Straddle System; Tanzania
Smart Wells
- Interventionless Water Shutoff Allows Recovery Rate Optimization
FREECAP® – Swellable Packers; Timor Sea
- Intelligent Well
CAP; Japan
Screen/ICD
- Interventionless Water Shutoff Allows Recovery Rate Optimization
FREECAP® – Swellable Packers; Timor Sea
- FREECAP - Screen Flow Diversion
FREECAP®; Norway
Stimulation
- Zonal Isolation
SlikPak™ Plus – Slickline/E-line Inflatable Packer; Offshore Qatar
- Interventionless Water Shutoff Allows Recovery Rate Optimization
FREECAP® – Swellable Packers; Timor Sea
- Selective Test Or Treat - Acidizing
PosiFrac® Multi-stage Straddle System; Canada
- Open Hole Hydraulic Fracturing
PosiFrac® Reservoir Optimization Multi-stage Straddle System; Alabama
- Straddle Test And Treat
PosiFrac® Multi-stage Straddle System; Trinidad
- Greatly Improved Flow Rates/Efficiency In Open Hole Sand Fracture
Insta-Set Valve® installed on the PosiFrac® Straddle Tool; Southeast Saskatchewan and South Manitoba
- Polymer Injection into Gas Producing Well
Single Set Inflatable Packer with 250 TE Element; Colombia